Premium polyaspartic concrete coatings for Northampton, Florence, and Leeds — garages, basements, and patios finished right.
Northampton homes have character — Victorians near downtown, village houses in Florence and Leeds — and character usually comes with original concrete: damp basements, cracked garage slabs, and floors that shed dust no matter how often they're swept.
Our system is built for exactly that. We grind and repair the slab first, then install a polyaspartic coating that seals out moisture, resists salt and chemicals, and is designed to resist abrasion — from our shop in Three Rivers, about 30 minutes away.
Upgrade your garage with our robust chip systems. Superior adhesion and beautiful finish.
Learn More →Durable, moisture-resistant flooring for your finished basement or game room.
Learn More →Our standard garage system uses an epoxy moisture vapor barrier base coat with a polyaspartic topcoat. Choose a flake, quartz, or solid-color finish. The epoxy base helps manage moisture vapor and provides adhesion; the polyaspartic topcoat is designed to resist abrasion, chemicals, and yellowing. Residential floors are backed by our written Limited Lifetime Residential Warranty.
Tough topcoat
Polyaspartic topcoat over an epoxy base.
About 72 hours
Until you can park on it in warm weather (longer in cool weather)
In writing
Limited Lifetime Residential Warranty
Yes — Northampton, Florence, and Leeds are all in our service area. We're based in Three Rivers, about 30 minutes away, and we install garage, basement, and patio coatings across the city. Damp-basement floors are a specialty here.
Most Northampton garages come in between $8 and $12 per square foot depending on size and slab condition — common repairs for older Noho concrete, like grinding and crack fill, are included. You'll get an exact price in a free estimate.
Yes. Our standard garage floor is an epoxy moisture vapor barrier base with a UV-stable polyaspartic topcoat, with optional flake or quartz. You get the seamless look people picture when they search "epoxy," plus a UV-stable topcoat designed to resist yellowing, abrasion, and chemicals. It's backed by our written Limited Lifetime Residential Warranty.
Most garage floors take 1–3 days to install. In warm weather, you can walk on it after about 24 hours and park on it after about 72 hours following the topcoat. It takes longer in cool weather. Full cure takes about 7 days, or longer if the selected products or conditions require it. We'll confirm the timeline for your floor with your quote.
We install industrial concrete coating systems. Our standard garage system combines diamond-grinding preparation, an epoxy moisture vapor barrier base, and a polyaspartic topcoat, with your chosen flake, quartz, or solid-color finish. Residential installations are backed by our written Limited Lifetime Residential Warranty. See the paint vs. coating comparison.
Not in Northampton? We install concrete coatings across the Pioneer Valley and beyond:
Contact us today for a free estimate tailored to your needs.